End-to-end engineering sign-off summary tying all five hardware and Companion Site phases to the verified deliverables in EnvelopeFollowerWithSkewLimiter (8ad81d0). For operational bench and ordering steps, follow the repository reference/checklists/ (8ad81d0) (01, 01b, 02–05) or step through the interactive, persistent Build Checklists on the live ENV / SKEW Companion Site (/build/).
Phase 1: SKiDL Netlist & 9-Section Schematic Parity
- SKiDL Circuit & Project Library (
envelope_follower.py):-
fp-lib-table&footprints/Eurorack_Custom.pretty/SW_Toggle_SPDT_Dailywell_2MS1.kicad_modconfigured (5.2 mmdrill, multi-layerF.Cu/B.Cu/*.Maskannular rings). -
erc_assertelectrical checks + SKiDLERC()pass (80netlist components,48active nets, explicitNCflags onSW1.1,SW2.1,J3.TN,J4.TN). -
jlcpcb_bom.csvexported with50SMDs across17rows and strictly3Extended SKUs (C2878713TL074HIDR,C83935BAT54S,C9520410k 0.1%).
-
- Structured Schematic (
generate_schematic.py->envelope_follower.kicad_sch):-
9labeled functional blocks matching A3 landscape sheet layout (Sections1–9,U1A–U1E/U2A–U2E). -
kicad-cli sch ercpasses cleanly (0errors,0warnings) and 4-layer netlist parity matchesbuild_circuit()withoutdnp_prefixes. - Visual inspection via Pillow crops confirms readable labels and zero overlapping text across all
9sections.
-
Phase 2: Main PCB Layout, Routing & Hybrid Silkscreen Polish
- Board Geometry & Placement (
generate_kicad_pcb.py->envelope_follower.kicad_pcb):-
30.00 × 108.00 mm2-layer FR-4 outline (GridOrigin/AuxOrigin=(100.00, 40.00) mm). -
83footprints placed:11F.Cupanel controls (RV1–RV4on15.50 mmvertical pitch,SW1–SW2,LED1,J1–J4),50B.CuSMDs,7B.CuTHT parts (C1,C2,C7,C11–C13,J_PWR),12DNP Keystone test points (TP1–TP12), and3bare-copperB.Cufiducials (FID1–FID3). - Cross-layer clearance check (
verify_placements()) passes with zeroB.Cubodies obstructingF.Cupanel shells or vice versa.
-
- Routing, Zones & DRC:
-
703trace segments +133vias (48nets) avoiding0acute traps, plusF.Cu/B.CufilledGNDzones (HitTestFilledAreaverified). -
kicad-cli pcb drc --severity-all --refill-zonespasses with0errors,0warnings,0unconnected items, and0schematic parity mismatches.
-
- Hybrid Silkscreen Co-Editing (
silk_layout.json+/edit-silkscreen):- Pinned layout synchronized via
--sync-silkand verified via--check-silk(--show-silkbottom X-flipped previews + generated PDF inspection). -
5.0 × 5.0 mmJLCPCB QR placeholder placed onF.SilkS(X = 23.8–28.8 mm, Y = 1.0–6.0 mm); heavy0.8 mm-12Vbar besideJ_PWR; dual-sided+onLED1+2-PIN R/G/TAYDA A-1076; off-boardB.Fabnotes (Y = 108 + 5.0 mm).
- Pinned layout synchronized via
Phase 3: Mated 6 HP Matte Black + ENIG Front Panel
- Blank-Front Cutouts & Spec (
generate_eurorack_panel.py --blank-front):-
30.00 × 128.50 mmpanel (AuxOrigin=(100.00, 29.75) mm, symmetrical10.25 mmY overhang) withpanel_svg_spec.mdcontract exported. - Cutouts verified:
4× 7.20 mmpot PTH (RV1–RV4),2× 5.20 mmsub-mini toggle PTH (SW1–SW2for Dailywell2MS1),4× 6.20 mmjack PTH (J1–J4),1× 3.20 mmLED1NPTH, and2× 5.50 × 3.20 mmM3 oval NPTH mounting slots (H1,H2). -
5mirroredB.SilkSitems placed collision-free by 2D SDF planner (stacked 3-line title/rev, rotated repo URL,5.0 × 5.0 mmrear QR blank at(22.50, 121.00)).
-
- Dark Techno / Brutalist Artwork (
vectorcraft-cli->panel_art/):- Batch generation (
--emit-commands,vectorcraft-cli run --commands,--postprocess-verify) passes40 px/mm(1016 PPI) clearance audit (>= 0.60 mmink-to-mask separation,0<text>/stroked nodes,0 pxinside nut/edge/rail/bezel keepouts). -
preview_clean.pngandpreview_keepouts.pngvisually signed off.
- Batch generation (
- KiCad 10 Panel Import (
panel_art/import_svgs_to_kicad.py->envelope_follower_panel.kicad_pcb):- Compound glyphs (
O,A,R,D,0, output knock-out pills) fractured viaSHAPE_POLY_SET.BooleanXor()+Fracture()into104F.SilkSpolygons and33F.Maskgold openings. -
(stackup ...)injected (Blackmask,Whitesilk,ENIG),F.Cu/B.Cu~95%GNDzones refilled,kicad-cli pcb drcpasses with0non-library violations (13expectedlib_footprint_issuesfiltered), andimages/panel_front.png+panel_back.pngverified.
- Compound glyphs (
Phase 4: Dual-Board Manufacturing, Visual Checklists, Orders & Patch Guides
- Fabrication Packages (
manufacturing/):- Main board (
envelope_follower_gerbers.zip, separatedPTH/NPTHdrills,manufacturing/jlcpcb_cpl.csv50/50bottom SMD parity). - Front panel (
envelope_follower_panel_gerbers.zip,--excellon-oval-format routeforH1/H2slots). -
analyze_gerbers.pyclean (125/125B.Pasteflashes matching50SMDs;0panel findings).
- Main board (
-
81Deterministic Visual Build Checklist Renders (PR#1):-
checklists/generate_pcba_alignment_images.pyrenders51images/pcba_alignment/PNGs (board_overview.png+50SMD cards for02-pcba-part-alignment.md). -
checklists/generate_hand_assembly_images.pyrenders21images/hand_assembly/PNGs (3overviews +18Manual THTcards for04-hand-assembly.md). -
checklists/generate_bringup_images.pyrenders9images/board_bringup/PNGs (00_test_point_map.png–08_troubleshooting_hotspots.pngfor05-board-bringup.md).
-
- THT Interactive BOM (
bom/ibom.html):- Exported via
InteractiveHtmlBom v2.11.1+filtered (Board variant field = JLCPCB_Class,Variants whitelist = Manual THT) to14rows /18THT parts (also hosted live at/bom/ibom.htmlon theENV / SKEWCompanion Site).
- Exported via
- Real-World Parts Order Record (
manufacturing/orders/tayda-1000489380.md, PR#28):- Canonical
03-tayda-ordering.mdkept untouched as a reusable template whiletayda-1000489380.md+tayda-1000489380.tsvlog batch substitutions (A-6764straight-lead electrolytics,A-69401.5 µFKEMET R82 shiftingSLOWcapacitance to3.47 µF/~2.13 srise &~1.31 sfall, and12.7 mmODA-4559knobs).
- Canonical
-
8Musical Patch Guides (patches/) & PythonruffHygiene (PR#2):-
patches/README.mdplus01–05(Envelope Follower Mode) and06–08(Asymmetric Skew Limiter Mode) authored, completing the20-file single-source hardware Markdown corpus. -
ruff checkandruff formatclean across all Python CAD and checklist scripts (includingDTZ011timezone-aware date fix ingenerate_schematic.py), andREADME.mdsynced as a Living Context Map ahead of Stage 8.
-
- JLCPCB Cart & Viewer Sign-Off (
01-main-board-ordering.md,01b-front-panel-ordering.md,02-pcba-part-alignment.md):- Upload
envelope_follower_gerbers.zip,jlcpcb_bom.csv(3Extended SKUs confirmed), andmanufacturing/jlcpcb_cpl.csv(LeadFree HASLorENIG-RoHS,SAC305,F.SilkSQR location, Bottom Side Economic PCBA). - Inspect every SMD part in JLCPCB’s 2D/3D Bottom viewer against dual
back=(X, Y)/board=(X, Y)coordinates and the51pcba_alignmentcards (U1,U2,D1–D5orientations confirmed). - Add
envelope_follower_panel_gerbers.zipto the same JLCPCB cart (Matte Black,Whitesilk,ENIG-RoHS, bare PCB, QR restricted toB.SilkS).
- Upload
- Tayda Parts, Hand Assembly & Bench Bring-Up (
03-tayda-ordering.md,04-hand-assembly.md,05-board-bringup.md):- Order all
18manual THT components (<= 14.0 mmknobs for15.50 mmpot pitch; checkA-1855/A-1672/A-8401shaft style; log any batch substitutions undermanufacturing/orders/). - Solder
B.Cuparts first (J_PWRnotch right,C1/C2opposite polarities,C7,C11–C13), trimF.Culeads flush,5 V + 1 kΩbench-testLED1(A-1076), snap pot anti-rotation tabs, dry-fit Matte Black + ENIG panel with nylon M3 washers, solder11panel controls, and scrub high-Z nodes (U2A.3,C11–C13,SW2) with IPA. - Cold resistance checks ->
±12 Vcurrent-limited (40–50 mA) power-up (SW1DOWN =RAW/OFF,SW2DOWN =FAST) -> verify all12test points (TP1–TP12) and musicalSLEW IN/ kick-ducking Patch Guides (adjustingSLOWtiming checks if1.5 µFA-6940substitutions are installed).
- Order all
Phase 5: Companion Site Planning, Verification & Launch
- Wayfinder Planning, Domain Model & Throwaway Prototypes (Map
#4→ Spec#17):-
mattpocock/skillsinstalled (10→49locked skills inskills-lock.json) and/setup-matt-pocock-skillsconfigured (PR#3). - Parallel AFK
wayfinder:researchreports merged (static-site-generators.md,origin-attribution.md),GLOSSARY.md(5Companion Site archetypes) and 3-criteria ADR0001-astro-core-single-source-site.mdlocked, throwaway UI prototypes evaluated (c1547cb,4baa64e), and decision-complete Spec#17compiled.
-
- Single-Source Astro Core Build (
site/, PRs#29–#31):-
10vertical slices (/to-tickets+/implement-spec) built into25canonical HTML routes (5Curated Pages,9Patch Guides,7Build Checklists,4Reference Specs) ingesting20unmodified root.mdfiles viaglob({ base: '..' })andrehype-single-source.ts. -
97allowlisted Static Passthroughs served/copied viastatic-passthrough.ts, alongside<env-skew-panel>,<zoom-pan-viewer>,<panel-layer-inspector>, persistent211-itemlocalStoragechecklists, and scoped Pagefind⌘Ksearch (5,004words).
-
- Zero-Chromium 2-Seam CI Verification (
site/):-
npm run typecheck(0errors across70files) andnpm test(79Vitest +happy-domtests across17suites in< 2 s) pass cleanly. -
npm run build+npm run check(site-contract.ts) verify all25routes,97Static Passthroughs (byte-identicalbom/ibom.html),0leaked internal files, resolved links/anchors, and211enabled/unchecked checklist items.
-
- Two-Axis
/code-review& Live Chrome DevTools QA (PR#32):- Independent Spec vs. Standards
/code-reviewfindings resolved (56b323facross19files). - Live Chrome DevTools QA verified
/patches/01-sidechain-ducking/,/hardware/#panel, and/, catching and fixing SVG<g data-layer>display="none"toggling and#4ADE80_03_Registration_Framestroke visibility in PR#32(8ad81d0).
- Independent Spec vs. Standards
- GitHub Pages OIDC CI/CD & Repository Front Door (
8ad81d0):-
.github/workflows/deploy-pages.ymlruns Node.js24LTS with unconditionalpull_requestverification and OIDC GitHub Pages deployment onmaintohttps://domesticmouse.github.io/EnvelopeFollowerWithSkewLimiter/. - GitHub Settings → Pages (
GitHub Actions), repository About metadata, and theREADME.mdtransition from Living Context Map (195lines) to Repository Front Door (123lines) verified complete.
-