Engineering Evolution & Mechanical Reference
These four single-source Reference Specs document the complete engineering lineage of ENV / SKEW—from extracting HAGIWO/ハギヲ’s original 6-op-amp schematic through electrical engineering review, locked 2× TL074HIDR production netlisting, and 1:1 mm 6 HP panel fabrication geometry.
EnvelopeFollower.mdBaseline Analysis · HAGIWO No. 43 Extraction
Envelope Follower Circuit Specification
Complete 6-op-amp circuit extraction from HAGIWO/ハギヲ’s Jan 2022 schematic: stage-by-stage transfer functions, 41-part BOM, and 30-net pinlist.
- 6 op-amps
- 41 parts
- 30 nets
- 4 display equations
EnvelopeFollowerImprovements.mdTier 1–3 Engineering Critique
Envelope Follower Circuit Review & Improvement Recommendations
Electrical engineering audit uncovering five Tier-1 flaws (divider collapse, D3 drop, OFFSET loading, input impedance, idle LED leak) and the Active Skew Limiter fix.
- 5 Tier-1 fixes
- 3 architectures compared
- 3 display equations
DesignSpec.mdLocked Production Architecture
Envelope Follower with Skew Limiter — Final Design Specification
Authoritative 2× TL074HIDR (8/8 sections, 0 trimmers) specification: 80-footprint BOM, FAST/SLOW timing tables, split-R SMOOTH filter, and 48-net pinlist.
- 80 footprints
- 48 nets
- 0 trimmers
- ±12 V (~13 mA)
panel_svg_spec.md6 HP Mechanical & SVG Contract
Eurorack Front-Panel Specification — ENVELOPE FOLLOWER + SKEW LIMITER
Exact 1:1 mm canvas coordinates (30.00 × 128.50 mm), NPTH mounting slots, control drills/keepouts, B.SilkS rules, and collapsible §8 JSON geometry.
- 6 HP × 3U
- 11 front controls
- §8 JSON geometry