Hand Assembly Checklist (Post-PCBA Through-Hole & Panel Build)

Follow this assembly sequence strictly in order. Installing B.Cu through-hole parts before F.Cu panel controls gives unrestricted soldering access on F.Cu and lets you trim every lead completely flush underneath the front-side pots and jacks.

Useful Tool — Interactive Hand-Assembly BOM: Open ../bom/ibom.html locally in a web browser while building. It is pre-filtered to the 18 hand-soldered non-SMD (Manual THT) parts (7 on B.Cu, 11 on F.Cu) with MPN and Manufacturer columns, clickable front/back placement highlighting, and built-in Sourced / Placed progress checkboxes.

Embedded Reference Screenshots: All images below are direct Bottom (B.Cu, with JLCPCB’s 50 SMDs populated) and Front (F.Cu) 3D renders exported from ../envelope_follower.kicad_pcb with through-hole component bodies hidden so empty plated holes and silkscreen polarity markings stay clearly visible. Regenerate after any PCB or silkscreen change with python3 checklists/generate_hand_assembly_images.py.


0. Incoming PCBA Inspection & Prep

    • Verify U1 Pin 1 is bottom-right and U2 Pin 1 is top-left in direct B.Cu view (matching the white B.SilkS Pin-1 dots).
    • Verify D1 & D2 (B5819W) cathode bands face left; D4 (1N4148W) cathode band faces right; D5 (1N4148W) cathode band faces left; D3 (BAT54S) has 2 pins right / 1 pin left.
    • Check for solder bridges, tombstones, cold joints, or shipping damage on all 50 SMDs.
    • TP2 (+12V) to TP1 (GND): no short (reads open / > 10 kΩ after MLCC charge).
    • TP3 (-12V) to TP1 (GND): no short (> 10 kΩ).

1. Optional DNP Test Points (TP1–TP12, B.Cu — Optional)

You can skip fitting pins and probe the 1.0 mm plated holes directly, fit wire/Ronghe RH-5001 loops only on TP1 (GND) and TP12 (GND2) for easy scope ground clips, or populate all 12.


2. Back-Side (B.Cu) Through-Hole Components (7 Parts — Do BEFORE F.Cu Controls!)

CRITICAL CLEARANCE RULE: Solder all B.Cu parts from the F.Cu (front) side, sit every component body flush against B.Cu, and trim every F.Cu lead flush (< 1.0 mm) so it cannot short against RV1–RV4, SW1–SW2, or J1–J4!

Box Film Capacitors (4 parts, non-polarized, B.Cu)

Shrouded Eurorack Power Header (1 part, KEYING CRITICAL, B.Cu)

    • Keying notch orientation: Shroud keying slot MUST face INWARD toward the center of the board (toward D1/R1 — matching the B.SilkS shroud outline).
    • -12V / Pin 1 check: Square Pad 1 & Pin 2 (-12V) are at the BOTTOM of the header (matching the B.SilkS Pin-1 triangle at bottom-right of J_PWR, and the F.SilkS -12V label + white bar at the bottom). Pins 9–10 (+12V) sit at the TOP under PWR.
    • Tack 1 corner pin first, verify the shroud sits completely flush and square on B.Cu, solder the remaining 9 pins on F.Cu, and trim all 10 pins flush (< 1.0 mm) underneath RV1.

Polarized Bulk Electrolytic Capacitors (2 parts, OPPOSITE POLARITIES!, B.Cu)

    • Long lead (+) goes into square Pad 1 (+12V) — INNER / RIGHT hole in direct B.Cu view (marked + on B.SilkS).
    • Short lead / white stripe (-) goes into round Pad 2 (GND) — OUTER / LEFT hole near the board edge (hatched half-circle on B.SilkS).
    • Seat flush (watch 11 mm max height clearance), solder on F.Cu, trim leads flush.
    • Long lead (+) goes into square Pad 1 (GND) — OUTER / LEFT hole near the board edge (marked + on B.SilkS).
    • Short lead / white stripe (-) goes into round Pad 2 (-12V) — INNER / RIGHT hole (hatched half-circle on B.SilkS).
    • DMM sanity check BEFORE trimming/moving on: Confirm continuity (< 0.5 Ω) from C2 (+) case/lead to TP1 (GND) and C2 (-) lead to TP3 (-12V). Installing C2 backward will reverse-bias and rupture the cap on power-up!
    • Seat flush, solder on F.Cu, trim leads flush.

3. Bench-Check LED1 (A-1076) Polarity

    • Connect a 5 V bench source in series with a 1 kΩ resistor across the two leads.
    • Note which polarity lights GREEN (and confirm reversing lights RED).
    • Mark the Green-anode (+V = Green) lead with a Sharpie or bend — this lead MUST go into LED1 Pad 1 (LEFT square pad on F.Cu, NET_LED_DRV), and the other lead goes into Pad 2 (RIGHT round pad on F.Cu, NET_LED_SENSE) (see LED1 placement card in Section 4 below).
    • (Verify: with +5 V applied to Pad 1 and GND on Pad 2, LED1 lights GREEN.)

4. Front-Side (F.Cu) Panel Controls — Dry-Fit Everything First (11 Parts)

CRITICAL RULE: DO NOT SOLDER any F.Cu component until ALL 11 front-panel controls are inserted, fitted through the 6 HP front panel, and aligned with tightened nuts! Soldering crooked pots or jacks before panel mating causes severe mechanical stress.

Component Prep & Dry-Fit on F.Cu

    • Insert marked Green-anode lead (+V = Green) into LEFT square Pad 1 and remaining lead into RIGHT round Pad 2. Do not push fully down onto PCB yet — leave leads long so the LED dome seats cleanly into the front-panel hole.
    • Confirm all 4 jacks seat flat on F.Cu (Sleeve at top square pad, Tip at bottom).

Panel Mating & Soldering (Solder from B.Cu)


5. Flux Cleaning & Final Pre-Power Inspection