Hand Assembly Checklist (Post-PCBA Through-Hole & Panel Build)
Follow this assembly sequence strictly in order. Installing B.Cu through-hole parts before F.Cu panel controls gives unrestricted soldering access on F.Cu and lets you trim every lead completely flush underneath the front-side pots and jacks.
Useful Tool — Interactive Hand-Assembly BOM: Open
../bom/ibom.htmllocally in a web browser while building. It is pre-filtered to the18hand-soldered non-SMD (Manual THT) parts (7onB.Cu,11onF.Cu) withMPNandManufacturercolumns, clickable front/back placement highlighting, and built-in Sourced / Placed progress checkboxes.Embedded Reference Screenshots: All images below are direct Bottom (
B.Cu, with JLCPCB’s50SMDs populated) and Front (F.Cu) 3D renders exported from../envelope_follower.kicad_pcbwith through-hole component bodies hidden so empty plated holes and silkscreen polarity markings stay clearly visible. Regenerate after any PCB or silkscreen change withpython3 checklists/generate_hand_assembly_images.py.
0. Incoming PCBA Inspection & Prep
- Verify
U1Pin 1 is bottom-right andU2Pin 1 is top-left in directB.Cuview (matching the whiteB.SilkSPin-1 dots). - Verify
D1&D2(B5819W) cathode bands face left;D4(1N4148W) cathode band faces right;D5(1N4148W) cathode band faces left;D3(BAT54S) has 2 pins right / 1 pin left. - Check for solder bridges, tombstones, cold joints, or shipping damage on all
50SMDs.
- Verify
TP2 (+12V)toTP1 (GND): no short (reads open /> 10 kΩafter MLCC charge).TP3 (-12V)toTP1 (GND): no short (> 10 kΩ).
1. Optional DNP Test Points (TP1–TP12, B.Cu — Optional)
You can skip fitting pins and probe the
1.0 mmplated holes directly, fit wire/RongheRH-5001loops only onTP1(GND) andTP12(GND2) for easy scope ground clips, or populate all12.
2. Back-Side (B.Cu) Through-Hole Components (7 Parts — Do BEFORE F.Cu Controls!)
CRITICAL CLEARANCE RULE: Solder all
B.Cuparts from theF.Cu(front) side, sit every component body flush againstB.Cu, and trim everyF.Culead flush (< 1.0 mm) so it cannot short againstRV1–RV4,SW1–SW2, orJ1–J4!
Box Film Capacitors (4 parts, non-polarized, B.Cu)
Shrouded Eurorack Power Header (1 part, KEYING CRITICAL, B.Cu)
-
- Keying notch orientation: Shroud keying slot MUST face INWARD toward the center of the board (toward
D1/R1— matching theB.SilkSshroud outline). -12V/ Pin 1 check: Square Pad 1 & Pin 2 (-12V) are at the BOTTOM of the header (matching theB.SilkSPin-1 triangle at bottom-right ofJ_PWR, and theF.SilkS-12Vlabel + white bar at the bottom). Pins9–10(+12V) sit at the TOP underPWR.- Tack 1 corner pin first, verify the shroud sits completely flush and square on
B.Cu, solder the remaining9pins onF.Cu, and trim all10pins flush (< 1.0 mm) underneathRV1.
- Keying notch orientation: Shroud keying slot MUST face INWARD toward the center of the board (toward
Polarized Bulk Electrolytic Capacitors (2 parts, OPPOSITE POLARITIES!, B.Cu)
-
- Long lead (
+) goes into square Pad 1 (+12V) — INNER / RIGHT hole in directB.Cuview (marked+onB.SilkS). - Short lead / white stripe (
-) goes into round Pad 2 (GND) — OUTER / LEFT hole near the board edge (hatched half-circle onB.SilkS). - Seat flush (watch
11 mmmax height clearance), solder onF.Cu, trim leads flush.
- Long lead (
-
- Long lead (
+) goes into square Pad 1 (GND) — OUTER / LEFT hole near the board edge (marked+onB.SilkS). - Short lead / white stripe (
-) goes into round Pad 2 (-12V) — INNER / RIGHT hole (hatched half-circle onB.SilkS). - DMM sanity check BEFORE trimming/moving on: Confirm continuity (
< 0.5 Ω) fromC2 (+)case/lead toTP1 (GND)andC2 (-)lead toTP3 (-12V). InstallingC2backward will reverse-bias and rupture the cap on power-up! - Seat flush, solder on
F.Cu, trim leads flush.
- Long lead (
3. Bench-Check LED1 (A-1076) Polarity
- Connect a
5 Vbench source in series with a1 kΩresistor across the two leads. - Note which polarity lights GREEN (and confirm reversing lights RED).
- Mark the Green-anode (
+V = Green) lead with a Sharpie or bend — this lead MUST go intoLED1Pad 1 (LEFT square pad onF.Cu,NET_LED_DRV), and the other lead goes into Pad 2 (RIGHT round pad onF.Cu,NET_LED_SENSE) (seeLED1placement card in Section 4 below). - (Verify: with
+5 Vapplied toPad 1andGNDonPad 2,LED1lights GREEN.)
- Connect a
4. Front-Side (F.Cu) Panel Controls — Dry-Fit Everything First (11 Parts)
CRITICAL RULE: DO NOT SOLDER any
F.Cucomponent until ALL11front-panel controls are inserted, fitted through the6 HPfront panel, and aligned with tightened nuts! Soldering crooked pots or jacks before panel mating causes severe mechanical stress.
Component Prep & Dry-Fit on F.Cu
-
-
-
-
-
- Insert marked Green-anode lead (
+V = Green) into LEFT square Pad 1 and remaining lead into RIGHT round Pad 2. Do not push fully down onto PCB yet — leave leads long so the LED dome seats cleanly into the front-panel hole.
- Insert marked Green-anode lead (
-
-
Confirm all 4 jacks seat flat on
F.Cu(Sleeveat top square pad,Tipat bottom). -
-
-
-
-