Step 050 / 30 completed (0%)
On-Page Outline9 sections

Board Bringup & Verification Checklist

Use this checklist to safely power up, verify, and test your assembled 6 HP Envelope Follower with Skew Limiter before installing it into a Eurorack case.

Viewing Convention & Reference Screenshots: Coordinates below list back (X, Y) (direct B.Cu back-side view upright with Y = 0 at top and back_X = 30.0 - board_X, matching the bench probing view) alongside front-referenced board (X, Y) (F.Cu). All embedded main-PCB figures are rendered from envelope_follower.kicad_pcb — regenerate them after any PCB or silkscreen change with python3 checklists/generate_bringup_images.py.


Test Point Reference (12 B.Cu Test Points)

RefDes Silkscreen Label Net Location (back X, Y / board X, Y mm) Expected Idle / Function
TP1 GND GND back (15.00, 105.60) / board (15.00, 105.60) bottom-center Lower scope ground clip
TP2 +12V +12V back (13.30, 2.25) / board (16.70, 2.25) top edge (J_PWR side) Filtered +11.54 V rail (post-D1/R1)
TP3 -12V -12V back (18.80, 2.25) / board (11.20, 2.25) top edge (center) Filtered -11.54 V rail (post-D2/R2)
TP4 PRE NET_PREAMP_OUT back (26.80, 20.00) / board (3.20, 20.00) B.Cu right column U1A.1 ×2.00 preamp (±10.0 V headroom)
TP9 HWR NET_RECT_HALF back (26.80, 26.50) / board (3.20, 26.50) B.Cu right column U1B / D3.1 half-wave rectifier check
TP5 RECT NET_RECT_OUT back (26.80, 33.00) / board (3.20, 33.00) B.Cu right column U1C.8 FWR (`1.000×
TP10 DRV NET_U1D_OUT back (26.80, 39.50) / board (3.20, 39.50) B.Cu right column U1D.14 skew driver swing & stability
TP6 ENV NET_ENV_BUF back (26.80, 46.00) / board (3.20, 46.00) B.Cu right column U2A.1 buffered V_env (zero cap loading)
TP11 OFF NET_OFF_WIPER back (26.80, 52.50) / board (3.20, 52.50) B.Cu right column RV4.2 ±4.98 V offset & center detent
TP7 INV NET_INV_AMP back (26.80, 59.00) / board (3.20, 59.00) B.Cu right column U2B.7 -(V_env + V_off) (SMOOTH check)
TP8 OUT NET_OUT_AMP back (26.80, 65.00) / board (3.20, 65.00) B.Cu right column U2C.8 +(V_env + V_off) & U2D input
TP12 GND2 GND back (26.80, 2.50) / board (3.20, 2.50) B.Cu top-right corner Upper scope ground clip

Bench Equipment & Initial Control State

    • RV1 (GAIN): Full CCW (0%)
    • RV2 (ATK): Full CCW (min attack)
    • RV3 (REL): Full CCW (min release)
    • RV4 (OFFSET): Center detent (12 o'clock)
    • SW1 (SMOOTH): DOWN (RAW / OFF)
    • SW2 (FAST/SLOW): DOWN (FAST)

Phase 1 — Unpowered Cold Checks (Power OFF)

    • J_PWR keying notch faces board center; -12V Pins 1–2 at bottom (-12V bar on F.SilkS).
    • C1 + at inner/right square pad (+12V); C2 + at outer/left square pad (GND).
    • D1 & D2 cathode bands face left; U1 Pin 1 bottom-right; U2 Pin 1 top-left (B.Cu direct view).
    • TP2 (+12V) to TP1 (GND): > 10 kΩ (no dead short).
    • TP3 (-12V) to TP1 (GND): > 10 kΩ (no dead short).
    • TP2 (+12V) to TP3 (-12V): ~22 kΩ steady state (via R26+R27+RV4+R29+R28 OFFSET string; not 0 Ω).
    • Red probe on J_PWR Pin 9/10 (+12V in), Black probe on TP2 (+12V): reads ~0.18–0.35 V (OL when probes reversed).
    • Red probe on TP3 (-12V), Black probe on J_PWR Pin 1/2 (-12V in): reads ~0.18–0.35 V (OL when probes reversed).

Phase 2 — First Power-Up (Smoke Test & Supply Rails)

    • Idle draw check: +12V reads ~8–11 mA and -12V reads ~8–11 mA (expected ~8.5 mA typ with LED1 dark).
    • ABORT IMMEDIATELY if either rail exceeds 20 mA, hits current limit, or drops below 11 V!
    • TP2 (+12V): +11.40 V to +11.80 V (~+11.6–11.7 V idle; ~+11.54 V at peak load)
    • TP3 (-12V): -11.40 V to -11.80 V (~-11.6–11.7 V idle; ~-11.54 V at peak load)

Phase 3 — Quiescent DC Bias, OFFSET & LED1 Verification (No Input)

    • TP4 (PRE): 0.00 V ± 10 mV
    • TP9 (HWR): 0.00 V ± 15 mV
    • TP5 (RECT): 0.00 V ± 15 mV
    • TP6 (ENV): 0.00 V ± 15 mV
    • TP10 (DRV): steady within ±0.7 V on oscilloscope — confirm ZERO high-frequency oscillation (10 kHz–5 MHz)
    • TP11 (OFF): 0.00 V ± 120 mV (pot center-detent tolerance)
    • TP7 (INV), TP8 (OUT), J3 (OUT), J4 (INV_OUT): 0.00 V ± 150 mV
    • LED1: Completely DARK (off)
    • TP11 (OFF) = +4.75 V to +5.15 V (nominal +4.98 V)
    • TP8 (OUT) and J3 (OUT) = +4.75 V to +5.15 V (positive!)
    • TP7 (INV) and J4 (INV_OUT) = -4.75 V to -5.15 V (inverted!)
    • LED1: Glows solid GREEN (if Red, LED1 leads are swapped — desolder and flip LED1 before proceeding)
    • TP11 (OFF) = -4.75 V to -5.15 V (nominal -4.98 V)
    • TP8 (OUT) and J3 (OUT) = -4.75 V to -5.15 V
    • TP7 (INV) and J4 (INV_OUT) = +4.75 V to +5.15 V
    • LED1: Glows solid RED

Phase 4 — Audio Signal Path Verification (100–200 Hz, 10 Vpp / ±5 V Sine into J1 IN)

Patch a 100 Hz or 200 Hz, 10 Vpp (±5 V) sine wave into J1 (IN); clip scope ground to TP1/TP12:

    • Sweep RV1 (GAIN) from CCW to full CW: amplitude scales smoothly from 0 Vpp to 20.0 Vpp (±10.0 V) with zero clipping (×2.00 gain).
    • Dial RV1 (GAIN) back to 10.0 Vpp (±5.0 V) at TP4 for the remaining checks below.
    • Scope shows a clean negative half-wave rectified waveform (0 V to -5.0 V) with crisp zero transitions.
    • Scope shows a clean positive full-wave rectified waveform (0 V to +5.0 V at 2f) with adjacent lobes equal in peak height within ~1% (10 kΩ ±0.1% balance).
    • With RV2 (ATK) & RV3 (REL) CCW (FAST mode): TP6 (ENV) closely tracks the +5.0 V rectified lobes with no 0.65 V diode dead-zone gap.
    • Turn RV3 (REL) up toward noon/CW: envelope decay lengthens smoothly while rise stays snappy.
    • Turn RV2 (ATK) up while RV3 is CCW: rise time slows down independently with zero divider voltage collapse when approaching a steady envelope.
    • Check TP10 (DRV) on scope while varying RV2/RV3: clean slew transitions, zero HF oscillation. Return RV2 & RV3 CCW.
    • Flip SW2 UP (SLOW): envelope smoothing visibly jumps by ~10.4× (470 nF → 4.87 µF). Flip SW2 back DOWN (FAST).
    • Set RV2 CCW and RV3 around 9–10 o'clock so 2f ripple is visible on TP7/TP8.
    • Flip SW1 UP (SMOOTH): 100–200 Hz ripple drops sharply (-11.1 dB @ 100 Hz) while DC peak level changes 0.00%. Flip SW1 back DOWN.
    • J3 (OUT) matches TP8 and J4 (INV_OUT) is the exact inverse mirror (V_OUT = -V_INV_OUT).
    • Sweep RV4 (OFFSET) across full travel while watching J3 (OUT) peak-to-peak height: the DC baseline shifts ±4.98 V with 0.00% amplitude modulation! Return RV4 to center detent.

Phase 5 — SLEW IN (J2) Normaling & Bipolar Timing Verification

    • Leave the 100 Hz sine patched into J1 (IN) and verify J1 audio disappears from TP6 / J3 (normal switch broken cleanly).
    • TP6 (ENV) and J3 (OUT) slew symmetrically from -5 V to +5 V and back; J4 (INV_OUT) outputs the exact inverted ramp (LED1 alternates Red ↔ Green cleanly).
    • SW2 DOWN (FAST), RV2/RV3 CCW: crisp step (~0.29 ms rise / ~0.18 ms fall).
    • SW2 DOWN (FAST), RV2/RV3 CW: ~289 ms rise / ~178 ms fall.
    • SW2 UP (SLOW), RV2/RV3 CCW: ~3.0 ms rise / ~1.8 ms fall.
    • SW2 UP (SLOW), RV2/RV3 CW: ~3.0 s rise / ~1.84 s fall (confirm C12/C13 hold voltage cleanly without fast droop — if droop is excessive, re-clean NET_ENV_CAP / NET_SLOW_CAPS flux!).

Phase 6 — Musical Workflow Check & Final Sign-Off

    • Set RV4 (OFFSET) full CCW (-5 V, LED1 steady RED, INV_OUT = +5 V), SW1 (SMOOTH) UP, SW2 DOWN (FAST), RV2 near CCW, RV3 around 10–11 o'clock.
    • Feed a kick drum into J1 (IN) and bring up RV1 (GAIN) until each kick dips LED1 cleanly down to dark (0 V) without flashing Green (INV_OUT ducks from +5 V to 0 V).
    • Set RV4 center, SW2 UP (SLOW), RV2 & RV3 past noon → verify smooth multi-second Green swells on OUT.

Troubleshooting Quick Reference

# Symptom Most Likely Cause Where to Check
1 Dead rail (0 V at TP2 or TP3) or excessive current on power-up D1/D2 reversed, C2 installed backward, or J_PWR rotated Power OFF immediately; inspect D1/D2 cathode bands (both face LEFT in B.Cu view), C2 (+ to GND), J_PWR notch
2 LED1 lights RED when OFFSET is CW (+5 V at J3) LED1 inserted backward Desolder LED1 and rotate 180° (+V = Green anode in Pad 1 — LEFT square pad on F.Cu, RIGHT square pad on B.Cu)
3 Half-wave or asymmetric lobes at TP5 (RECT) D3 (BAT54S) rotated or wrong pinout Verify D3 has 2 pins right / 1 pin left in B.Cu view and TP9 shows clean negative half-waves
4 Large ~0.6 V dead-zone or slow bleed droop in SLOW mode D4/D5 reversed, Schottky substituted for 1N4148W, or flux on NET_ENV_CAP Check D4 cathode RIGHT / D5 cathode LEFT; confirm 1N4148W silicon; clean RV2, RV3, C11–C13, SW2, U2.3 with 99% IPA
5 SW1 or SW2 works opposite to lever UP = ON Switch rotated or wrong pins soldered Confirm Pin 2 (center) connects to Pin 3 (bottom pad) when toggle lever is UP
6 No audio in Envelope Follower mode when J2 is unpatched J2 tip-normal switch (TN) open/bent or R15/R17 cold joint Probe TP5 (RECT) then J2.TN → J2.T → U1.12

Type to search across all 25 ENV / SKEW pages.

Reset Board Bringup checkboxes?

Clears all saved checkmarks for Step 05 in this browser. Your other build steps remain untouched.